Progress Report
Time for the end of the year progress report on my project.
All smashed glass has been removed
All the interior has been removed
all interior wiring had been removed, repaired if needed, and reinstalled.
all fuses replaced
Engine pull scheduled for Jan. 10-12 or Jan. 16-18.
Starting the fuel line rebuild/replacement.
Interior passenger seat installed.
If anyone has any extra fuel line/or fuel line accessories, please let me know, I am in need of injectors.
At last, the major pieces still missing are the windshield, instrument cluster, and crank sensor. Fuel system and vacuum system replacement.
I will have pics posted Jan. 1st, I still have a little work to do before I reveal the changes.
-Adam
__________________
1984 Euro 928S 310HP Stock
|