View Single Post
dad911 dad911 is online now
Platinum Member
 
dad911's Avatar
 
Join Date: Jul 2001
Location: Leave the gun. Take the cannoli.
Posts: 21,385
In NJ they should have put 4" stone, then poly, with the seams overlapped and sealed, and 4" concrete. AND A RADON VENT! which is perforated pipe, venting the stone. That is the code.

Crack is probably not a problem, no stone or radon vent is.

Per code, there should also be control joints.

Last edited by dad911; 05-12-2009 at 12:58 AM..
Old 05-11-2009, 04:23 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #19 (permalink)