Thread: Cement removal.
View Single Post
Zeke Zeke is online now
Registered
 
Zeke's Avatar
 
Join Date: Jan 2002
Location: Long Beach CA, the sewer by the sea.
Posts: 38,258
If there is any tractor access, a loader can pick up as much as 4' x 4' pieces. That's a lot faster than picking up rubble. Unless access is real tight, I always hire this phase out. It's cheaper in the long run. Trust me on this, I've filled my share of dumpsters and it was always labor intensive and expensive.
Old 05-14-2009, 03:41 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #10 (permalink)