|
Registered
Join Date: May 2002
Location: North County San Diego
Posts: 8,893
|
Agreed on wheel build.
I did a road race that had a long steep downhill that crossed over I-15 with a 4 lane bridge. The transition from road to bridge on the right shoulder was sharp... 2"+ inches of concrete higher than the asphalt road surface. That was 15+ years ago and I can still clearly hear the carnage of 4-5 riders suffering massive wheel failure while going 40+ mph. Luckily I had rode the course the week prior and knew to stay left at the bridge. Ugly stuff.
|