Quote:
Originally Posted by Geronimo '74
Not really, but if they charge too much, which happens ( they can try), I provide the data, plans, numbers to show them that they're wrong, and that were not paying extra.
I work for a group of contractors and I check the subcontractos so they don(t charge too much.
here's a link with more info:
http://www.railway-technology.com/projects/diabloproject/
The job includes two tunnels (2 x 1000m), 8.5 meters in diameter, a lot of roadworks and the expansion of an underground railwaystation (from 2 tracks to 4)
The TBM:
Interesting job, really, but I'd rather be wrenching... 
|
Cool. Doesn't the paint wear off rather quickly?
__________________
Make sure to check out my balls in the Pelican Parts Catalog! 917 inspired shift knobs.
'84 Targa - Arena Red - AX #104
'07 Toyota Camry Hybrid - Yes, I'm that guy...
'01 Toyota Corolla - Urban Camouflage - SOLD
|