I've decided on the GE 40 gal heater and to put a shower into the spare bathroom that was the silk screen washout room.
I've got one major line coming in from cold. this currently feeds two bathrooms (one was the silkscreen washout room) and the outside sink (where the silkscreen washout tub is now). One small hot line coming in from the 4 gallon mini-heater that feeds both bathrooms and the outside tub,
Adding in the shower, should I leave the existing hot line alone (leave it for working bathroom and cap the existing line into the shower room) and plump a T from the cold AFTER cold for both bathrooms and into the 40 gallon heater and then plumb from water heater to both pressure washer and shower control valve?
Does that make sense?
Bathroom to be shower. Toilet will be shower drain.
Luan with one coat of poly stain and rubbed down with steel wool. going to panel the shower area with the luan and accent with Al strip. Will make the shower base from home foam insulation and some triax carbon fiber I've had for ages. hoping to find some banker's glass on CL.