|
I would get a permit for any addition to the structure, the electrical system, or the plumbing system. I would get a permit for finishing an unfinished basement. I would get a permit for any outside project, if the local building dept. would expect one to be issued, e.g. adding a deck. I wouldn't get a permit to move an electrical circuit or plumbing within a room. I also wouldn't get one to move, modify, or remove a non-load-bearing wall.
__________________
Jim R.
|