Thread: Big Tile Job!
View Single Post
trekkor trekkor is offline
JW Apostate
 
trekkor's Avatar
 
Join Date: May 2004
Location: Napa, Ca
Posts: 14,164
The old subfloor was flexble 5/8 inch plywood.
Not glued to the joists and poorly nailed.

After placing a screw next to *every* nail,
I fastened 3/4 inch plywood over the top with 7,500 staples, 20#'s of screws and 30 gallons of glue





Very solid floor. No squeaks anywhere. Ready to handle the load.



KT
__________________
'74 914-6 2.6 SS #746
'01 Boxster
Old 04-03-2010, 11:18 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #4 (permalink)