Quote:
Originally Posted by red-beard
Chris, I can help you find the tools to do the job, 'cause you know you're gonna need a small bulldozer and backhoe loader, if you do it yourself!
"But honey, I need a bulldozer to level the foundation. Plus I can use it to create that pond you've always wanted!"
|
I already have a concrete contractor that did my patio in mind. I think the pad alone would run around $10,000. The shed that it is replace already has electricity, so I'd hire a contractor to put in the main panel and do the rest myself.
My only real concern is erecting the steel frame and what I'd need for that. I also don't know if I would have to have studs put in the concrete to attach the frame to pre- or post-pour.