|
I've had PG&E be off on the location of a gas main by 40 feet. We were skeptical of their location, so hired a private locater who found it before we did with our drill rig.
Another time, I was doing a geotech job for a large municipal water district. A guy from the water district came out to mark where we should drill so we wouldn't hit their pressurized 4-foot water main. We hit it dead center. Created a nice looking geyser and knocked out the water supply for an entire town for two days.
__________________
Charlie
1966 912 Polo Red
1950 VW Bug
1983 VW Westfalia; 1989 VW Syncro Tristar Doka
|