Quote:
Originally Posted by look 171
3/4" isn't bad at all. pull the tube and button it back up with plywood sub floor and level the tub. Float the floor(if tile) and be done with it. On some higher dollar jobs, We have can cut angle shims out of 2x material and put them on top of the floor joist and level the floor that way and install the tub and finish up. does it have any sag in the foundation? windows and door operate well and are sq? If so, level the floor and finish up.
|
+1 that's how I'd do it
"We have can cut angle shims out of 2x material and put them on top of the floor joist and level the floor that way and install the tub and finish up. "