|
Nice work!
Mine is very slowly coming together too.
What do you plan to do about drainage?
The two pipes at the back, connected to the internal roof gutter, need somewhere to go.
Currently, I have two rubber pipes on them which drain down under the side windows,
but this is just temporary.
Keep up the good work.
Rich
|