Thanks guys for the encouraging words. Almost 12 years seems like a long time here, but there are a lot of folks who have 20-25-even 30 years with the company. That says alot!
Quote:
Originally Posted by masraum
Blech!! I hope you've got fiber tray, and won't be working under a raised floor. I don't mind doing really short runs of copper or fiber, but I'm not big on long runs or even worse, under the floor work. I'm glad we've got "guys" for cable work.
|
Actually, I'm just replacing temp fiber that was run overhead from one isle to another since the fiber patch panels weren't yet installed over my equipment when we went live with the SVC. And the perm cables have already been added to the patch panel. (I'm in the computer room now as I type!

) This is far easier to manage than the fiber in the old datacenter - which was run (by me) under the floor. Some of which now needs to be removed. The dark side of SAN storage!
-Z-man.