|
Big time. They're going to make him halt construction, and get an architect to draw the thing up and get all the permits. Since he decided to be a jackhole about it, don't be suprised if they want sign offs from a structural engineer, and a geotech just for good measure.
If the foundation ain't right......*BUZZ*...game over. At that point, all choices bad.
btw, I would call the city. Absolutely. There is a reason we have a permiting process.
|