|
Engineering Question/Problem to solve:
Conditions:
A backhoe weighing 22 tons is on top of a lowboy trailer and heading
east on Interstate 70 near Hays, Kansas .
The extended shovel arm is made of hardened refined steel and the
approaching overpass is made of commercial-grade concrete, reinforced
with 1 inch steel rebar spaced at 6 inch intervals in a criss-cross
pattern layered at 1 foot vertical spacing.
Solve:
When the shovel arm hits the overpass, how fast do you have to be
going to slice the bridge in half ? (Assume no effect for headwind
and no braking by the driver.)
Extra Credit: Solve for the time and distance Required for the entire
rig to come to a complete stop after hitting the overpass at the
speed calculated above. Yes, you can neglect friction
__________________
Michael D. Holloway
https://simple.m.wikipedia.org/wiki/Michael_D._Holloway
https://5thorderindustry.com/
https://www.amazon.com/s?k=michael+d+holloway&crid=3AWD8RUVY3E2F&sprefix= michael+d+holloway%2Caps%2C136&ref=nb_sb_noss_1
|