View Single Post
trekkor trekkor is offline
JW Apostate
 
trekkor's Avatar
 
Join Date: May 2004
Location: Napa, Ca
Posts: 14,164
I think he is asking for the price to build the curb, pre-slope, water proof the pan, paper/wire and float the entire enclosure.

I would charge $1750.
That is all materials and labor.

You'd be ready to tile after I was done.


KT
__________________
'74 914-6 2.6 SS #746
'01 Boxster
Old 03-12-2011, 10:11 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #49 (permalink)