|
I read that the tile should be kept in the same space for a few days before laying to equalize. 70-80 degree temps would be perfect.
For my interior application onto luan board, I made the mistake of bringing cold tile in and installing it soon after. Got some seperation and some crowding areas.
A garage floor is going to get oil and solvents inbetween the cracks and eventually bubble the edges. Not sure what the best seam sealer/adhesive on the market would be. The same color would be best.
|