While the grout is curing, it's on to Phase II. The area 10" or so in front of the shower was also rotten,but it was on the other side of the joist, so today I ripped out the subfloor on that side and starting fitting mini joists. I would have had it buttoned up this afternoon but I brain-farted and cut one of the joists too short - d'oh!