Took some pictures which I will post lower down - couple of questions
Bonding - by not bonding what issues would that cause if they pour over top - I would imagine the weight of the new bad would keep it in place - would it cause issues with cracking? I understand if tiled over as the weight would be much less and also it would be multiple pieces
Height issues - when taking pictures this morning I realized if they poured another 3 inches over top. The pad would be right at the level of my siding and I imagine that would not be a good thing as it would make it more likely for water to get behind the siding. Am I correct in that thought process?
Ok here are the pictures
This is the first area that was stamped
This is an area that is about 2 feet away from the first photo and done right after that first area
This is the edge of the pad that was stamped first again several feet away from the other two photos
This is the middle of the pad
This was one of the last areas stamped
This is the edge of the one of the last areas stamped
This was I believe the last stamp put down