|
Fuchs dating
In Europe they use the week of the year something is built (1st 2 numbers) followed by the last 2 representing the year. I.E. made in the 27th week of 1981.
I may be wrong about Fuchs but I have seen this date coding system used before in manufacturing goods (tires possibly). DP
|