|
construction ? on pile drivers
A construction crew next door has been driving 60 ft reinforced cement piles into the ground for about two weeks. They drive them about 6 feet down and pull the driver up and out. Why do they drive them below ground? How do they attach to them?
thanks
__________________
steve
old rocket inguneer
|