|
Registered
Join Date: Jan 2002
Location: Long Beach CA, the sewer by the sea.
Posts: 38,169
|
I would not go light on the base. If you lay the bricks on 2" while it's wet, that will be better. But, you will need 2 batches going, one mortar and one with gravel for the base. If you wet the bricks slightly, it will be stronger.
2" is the min, I'd go at least that with some pencil rod in the base.
|