Cubic Concrette is cheper than redoing it. I just poured my garage floor. Code is 4" + rebar. I had it done to 5" at the shallow and 6" at the back of the garage. Figure $120 per cubic yard if your project uses 12 yards for code and you run 14-15 yards but it lasts 10 years longer your saving $$$ figure that concrete will be 1/4 the cost of labor.