Quote:
Originally Posted by URY914
Every manufacturer will change you extra for sign/sealed drawings. They are not always needed so they are not part of the baseline package price. If you need them, then you will pay for them.
|
its not the drawings that are costing you the money (its a sunk cost), its the liability incurred by the engineer caused by your local municipality requiring the stamped drawings.
its unlikely that any professional engineer is going to give you drawings for less than that, but you can certainly try. As a professional engineer, I cant take a piss for less than $500.
Its just the nature of the industry... I'm in it... and I'm not a fan.
:shrugs: