View Single Post
kach22i kach22i is offline
Banned
 
kach22i's Avatar
 
Join Date: Mar 2004
Location: Michigan
Posts: 54,057
Quote:
Originally Posted by patssle View Post
$600 for drawings.
If that includes foundation/footing design plus an engineer's seal you are getting a bargain.

Normally pre-fab buildings require a local engineer design the footings based on a soil boring report. Do you have one of those?
Old 09-13-2012, 07:12 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #19 (permalink)