View Single Post
1990C4S 1990C4S is offline
Registered
 
Join Date: Sep 2009
Location: North of You
Posts: 9,160
Quote:
Originally Posted by trekkor View Post
Start with the original subfloor.

Install a long screw next to each nail. ( 2" or longer )

The hardie backer must be embedded in modified thin set with a 1/4x1/4 notched trowel or you will:

1. void the manufacturer's warranty.
2. likely get cracks in the tile
3. may hear pops or creaks in the floor when walked on.

I fasten the backer with 1.25" roofing nails. Tape the joints with fiberglass mesh using high quality thinset.

You may need to use a self leveling material to assure that the floor is very flat, given the type of tile you have selected.

With marble use a 1/2x1/2 or 3/4x3/4 notched trowel with a high quality thinset.
Take you time. Do not let the installation creep out of square.
Any lippage from adjoining tile to tile will look and feel awful ( especially on bare feet )

Pre-seal the marble with 511 Impregnator prior to grouting.
Use a stiff non-sanded grout and do not over wash or use excessive water in your sponges.
Do not attempt to remove all of the grout streaks, rather concentrate on a quality grout joint fullness and finish.

Re-apply a coat of sealer and buff dry.


Have fun~ Don't rush!
Marble or granite tiles are among the most difficult to install properly.


KT
So I remove the plywood, screw the existing sub-floor to the studs, and put the Hardi board on the subfloor with thin-set?
__________________
"A machine you build yourself is a vote for a different way of life. There are things you have to earn with your hands."
Old 01-09-2013, 02:28 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #20 (permalink)