Quote:
Originally Posted by Porsche-poor
For us the CAD file is just a deliverable. Paper copies that are signed and stamped are the official docs.
|
We send a lot of PDFs with electronically verified signatures to the Architects..official submissions are only sometimes hard copied wet signed drawings these days. Less and less each year.