|
Project list update:
1. Brake master cylinder done
2. DOT 4 brake fluid change done
3. Brake rotors, pads and lines (on order)
4. Replace front and rear shocks and struts
5. Replace a/c condenser, hi/lo pressure switch and drier (on order)
6. Interior overhaul (dash cracks, headliner, etc.)
7. Who knows
__________________
Sincerely,
uvachief 
1986 944 NA Red 5SPD
Last edited by uvachief; 05-09-2013 at 09:27 PM..
Reason: compressor checked out okay
|