Quote:
Originally Posted by oldE
Shaun,
Neat project.
If you get two feet of snow again, I suspect the snow trapped between the adjacent building and your new structure is going to jack your shelter away from the building.
Best
Les
|
in the past Les, it has only bulged in between the skeleton, but that was when I had the 20 degree incline of a ready-made shelter. I made this at 45 for more space, feeling less like a cave.
Mostly the snow just sits on top.
But I am going to work on something so it either gets caught above the gap or all slides to the yard next to me.