|
Edgar,
I was a Gas Turbine engineer for many years. For the old GE units, the #2 would need about 1200-1400 psi to create the fine mist. Later, we used compressed air to atomize the liquid fuels.
Under the existing circumstances for an empty fuel tank at take off even in July at JFK, the tank would not have had explosive vapors.
__________________
James
The pessimist complains about the wind; the optimist expects it to change; the engineer adjusts the sails.- William Arthur Ward (1921-1994)
Red-beard for President, 2020
|