|
I don't what these guys are thinking.
I couldn't even float the bathroom for $2000.
Also, are these guys licensed tile contractors?
This is a three week long job for me.
Those prices are very low and they include the materials, too?
KT
__________________
'74 914-6 2.6 SS #746
'01 Boxster
|