Quote:
Originally Posted by rfuerst911sc
Here's mine I " cut " the floor years after the floor was originally poured. Turns out the previous owner had the floor poured 8 " thick ! Rented a wet saw, marked it out and went to town. Reinforced with rebar tied into the existing slab. Made a floating form and had some pro's come in to pour it. Came out great. Regardless of what kind of lift you have it's MUCH better than crawling around on the floor 
|
I am very interested in doing that.
You say you tied the new rebar into to rebar from the slab. Did you weld the rebar together? How did you tie it together. If that the Bend-Pack lift? Did it come with the pads for the wheels?
Have you though of a cover of some sort to keep leaves and junk out of the pit when the lift is not in use?
If you were starting over would you do anything differently?