Quote:
Originally Posted by Evans, Marv
Tell him to come back & use a hammer drill to sink some holes & install new ones. I would never let somebody do anything without me being there, at least at the beginning of the job.
|
That's what he is going to do. After talking to him we know what he did. He was pouring over an old slab (in order to raise the floor). He followed a stress relief line on the old slab instead of looking at the wall, or the header, or the two chalk lines on the floor (4 inches apart with the word "wall" written between them). Even he said it was a boneheaded mistake. That old stress line has no relevance to anything.
I was there just after they started. I saw them finish setting up the first 16 feet of form. By then they had plastic and wire down and I couldn't see that the form wasn't following the chalk lines.