And NO to the response of codes being "guidelines".... Adopted code is law, law broken get citations.
2 reasons this may be a required fix.... 1 if the conduit was used as a means of grounding/bonding the equipment. 2 if not having that conductor covered was seen as "subject to physical damage".
I see the second as the only possible in this case. Therefore, covering with Sch 80 conduit would be fine.
|