If your slab is supposed to be more than 2.5" thick then the GC didn't do the job properly. Shouldn't he be responsible to make it right and cut out the entire floor and re-pour it to the correct depth?
|
That is where I am. I just had a 20x40 pour to six inch depth. Even though I know the Amish guy I hired very well, I inspected the area before the pour since I am also adding a lift.