Quote:
Originally Posted by wdfifteen
|
This, but I would probably cut the sheathing as close as I could with the circular saw first. That would leave a piece about 1.5" wide sticking down. Once you strap the joists and put drywall up there a piece of cove will cover the small edge of sheathing.
Best
Les