I don't know the specifics in your case, but our plans generally call for footing 10" high by 20-24" wide. If you are talking about the septic/sewer line, (4" pipe?), with 6" sleeve through the footing (6" PVC OD is 6-5/8") you have significantly weakened the footing.
We would typically run the pipe under (with compaction and stone) or over the footing in the foundation.