|
I notice you guys are all using prefab 'snap track'. When I was a kid, I got it in my head that using that stuff was for amateurs, so I insisted on laying track bed and track manually. I guess I was reading too much Model Railroader magazine at the time. This, of course, took 10x longer, and often lead to poor track conditions in curves. In never finished a layout. If I ever have another go at it, I'll go with prefab track.
|