View Single Post
ckelly78z ckelly78z is offline
Registered
 
Join Date: Jan 2012
Location: NW Ohio
Posts: 9,733
On my bathroom half wall about 3' long, I made the bottom frame out of 2"x4"s and then filled in the horizontal space with another 2"x2" so the wall before drywall was 5.5" thick. I then screwed all three 2-bys together and then lag bolted it in 6 places to the two 3/4" thick plywood sub floor.

15 years later, that wall is still holding fast and has seen a lot of slamming doors and leaning people with nary a movement.
Old 02-08-2015, 04:47 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #8 (permalink)