View Single Post
jyl jyl is online now
Registered
 
jyl's Avatar
 
Join Date: Jan 2002
Location: Nor California & Pac NW
Posts: 24,784
Garage
Some people are very involved with their church, and have roles during the services, whether it be greeter, chorus, passing the donation basket, etc. There is always some flexibility, if a person is sick or has an important conflict or emergency, someone else steps in. Even the priest can get a stand-in if necessary. They didn't consider the meeting with you to be important enough to make those arrangements. Since you and they will presumably need to meet with them multiple times during the two months of the job, this will be a recurrent issue. Therefore, good call to not take the job. I would tell them the time frame for the job is very short, your schedule and their schedule are both very full, so scheduling meetings and getting the job done on time will be too difficult.
__________________
1989 3.2 Carrera coupe; 1988 Westy Vanagon, Zetec; 1986 E28 M30; 1994 W124; 2004 S211
What? Uh . . . “he” and “him”?
Old 03-09-2015, 06:24 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #33 (permalink)