Quote:
Originally Posted by fintstone
I would run a single new line from right to left using the "blaster" method. You can do the entire '25 ft (12.5 from each side). I would then put the "T" on the left side and run the line parallel to the drive. A "T" under the concrete was a bad idea.
|
+1^
That by far is going to be the cheapest route and the quickest. There's no way you're going to want to foot the bill for any thermal type of location option, etc.