Irony defined.......this project I am doing......for "some" reason the paver contractor left a big ramp/hump where there should have been some type of steps (or transition into the yard) built. Instead they left a "hump". I got involved to the extent to have the GC put in some RR Tie steps....a simple 2 step design.
So (as usual) they over did it...put in 3 steps and thus needlessly excavated a whole bunch of soil...and left it piled up next to the new steps....which created another "hump" that I now have to deal with.
Now that is irony!