Quote:
Originally Posted by afterburn 549
With a 3 beam scale you will have it done inside 2 hours. EZ
|
Not here - haven't been down this track before. Alays a bit nervous before attacking parts. I think within a day and I would consider myself lucky. :-) Have to feel my way with this.
Alan
__________________
83 SC, 82 930 (track) - Stock except for RarlyL8 race headers, RarlyL8 Zork, K27-7006, 22/28 T bars, 007 Fuel head, short 3&4 gears, NGK AFR, Greddy EBC (on the slippery slope), Wevo engine mounts, ERP rear camber adjust and mono balls, Tarret front monoball camber adjust, Elgin cams, 38mm ported heads, 964 IC. 380rwhp @ 0.8bar Apart from above, bone stock:-)
|