So you have a 50 foot trench or so, probably 12 feet down, straight shot. Maybe another 20-30 feet to the median, so 70 feet or so depending on what side the sewer main is on? That can be dug up in a day, boarded up, backfilled the next day past the sidewalk. I'd say if you can aim for the tree clearing, bring the sewer up inside the basement, then you're golden. Should not be too bad.