|
Information Overloader
Join Date: Mar 2003
Location: NW Lower Michigan
Posts: 29,989
|
I let some blood out before I begin the project. That way I choose the time, location and severity and have the paper towel and duck tape all set to go.
Huge time-saver. Plus, the kitchen floor doesn't require the usual aftermath hazmat protocol.
|