Quote:
Originally Posted by Jim Richards
I was an electrician for a while before becoming an engineer. I always cut power before working on any circuit. The guy you're working with is trying out for the Darwin Award.
|
I do as well but he was in a hurry to get the job done. I was just the helper today so I did what he asked. The plumber is coming in Friday to move the pipes for the new kitchen layout. It's crazy as the existing space was just beautiful as it was but the lady wants it all redone with a completely different layout, a large window and new flooring. The floor was installed by the PO about 2 years ago!