|
Registered
Join Date: May 2004
Location: Lake Cle Elum - Eastern WA.
Posts: 8,417
|
I let my builder do this as part of the excavation process. When digging the footings, he cleared the driveway and removed about 20 good sized trees. Trees stacked neatly for firewood later. Stumps in a burn pile. Graded for a lawn. 3 acre parcel.
At my previous place, I sold 3 and half log trucks full of trees. I got 1/2 of what the logger received. I was paid directly by the mill from the load slips.
__________________
Bob S.
73.5 911T
1969 911T Coo' pay (one owner)
1960 Mercedes 190SL
1962 XKE Roadster (sold) - 13 motorcycles
|