Quote:
Originally Posted by SoCal911T View Post
And even if things were done to code when originally installed, the building department would want everything to comply with 2016 code.
How is it currently zoned on the title, R1?
You would only need to stick to the new code for new work, such as remodel. If he had a permit when the work was done, then he's ok. But if not, or there was work done without a permit, then he's screwed in so far as he will have to redo that work under the new code.
Old 12-27-2016, 12:58 PM