rnln. No, the cost per yard at the time was something like $120/yd., which included the color. You will have to go through the normal bid process with the contractors. If I remember correctly, my per s.f. cost was around $4.25 including the color & stamping. I talked to about four or five contractors & as typical the price varied a lot. The one I went with was the lowest, although lowest price wasn't the determining factor. Concrete is concrete, so if it has the right psi rating, the code or better amount of reinforcing, thickness, etc., for specs and all things equal then price is what you look at. At the time, the total s.f. was right at 2,400 and the total cost was somewhere around $9,400.
__________________
Marv Evans
'69 911E
Last edited by Evans, Marv; 01-30-2017 at 10:30 AM..
|