The wall is making progress. Now just the border along the sidewalk. We will have plenty of rocks left. Mrs Carrera bought a ton of new plants yesterday. We still need pickup load full of soil. I did haul the old pallet that the rocks were delivered on to the office. It is out front on the curb. It was one HEAVY pallet. I was feeling like a wimp until I took a closer look. The cross-members on the bottom are square blocks and look very sturdy and the main surface is heavier wood than normal. I guess that makes sense because the load it carried was 3.8 tons. All of those 3.8 tons of rock are off loaded and I really think they felt like were 38 tons.
You can see the front edge of the wall is wet. I tested the sprinkler system for the yard since it was modified to get the area of the new garden off of the section. We placed concrete blocks along the inside of the wall and drove rebar down into the blocks to add in strength sine the wall is just a dry stack.
You can see the Macan and the El Camino in the garage. The 911 is hiding behind the windows.
Good Hump day morning all. Phew I need a nap.